3 Roll Calender Machine
-
Payment
-
Origin
China Mainland
-
Minimum Order
1
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
Application:
Process rubber sheet, adhibit rubber, rub rubber etc.
Features:
Each machine is composed of such main parts as: bed, drilled rolls, gear reducers, the grease lubrication system, gap control mechanism (electric), emergency stop device, etc.
Specification | Roll dia. (mm) | Mid-roll liner speed(m/min) | Min. Thickness of the product (mm) | Calendering width (mm) | Motor power (KW) | Overall dimension (LxWxH) (mm) | Weight (T) |
XY-3I(F)1120 | 360x1120 | 2-20 | =0.20 | 900 | 40 | 6050x1660x2330 | 11.6 |
XY-3I(F)1400 | 400x1400 | 2.5-25 | =0.20 | 1200 | 55 | 5600x1410x2385 | 15 |
XY-3I(F)1450 | 450x1450 | 2.5-25 | =0.20 | 1225 | 75 | 5850x1920x2870 | 25 |
XY-3I(F)1600 | 510x1600 | 2.5-25 | =0.20 | 800 | 110 | 6025x3300x3800 | 30 |
XY-3I(F)1730 | 610x1730 | 4.5-45 | =0.20 | 800 | 160 | 6025x3300x3800 | 33 |
XY-3I(F)2540 | 820x2540 | 3-30 | =0.20 | 2200 | 160x3 | 10195x3340x5820 | 133 |
XY-3I(F)3400 | 900x3400 | 3-30 | =0.20 | 3100 | 220x3 | 7900x4500x5680 | 150 |
Commercial terms
1. Payment: 30% by T/T as advance payment, balance(70%) by T/T before shipment
2. Lead Time: 120 days after receiving the advance payment
3. Transportation: container, simple package ( PE film, salver)
4.Warranty period: From the day of the use of the machine in the buyer’s factory:
(1) The mechanical Parts: 12 months
(2) The electrical Parts: 6 months
5. Installations and Commissioning
(1) Up to date commissioning has been made before shipment
(2) Overseas Commissioning and charges one or two technicians will be sent to the buyer to guide the
installation and commissioning of the equipment if the customer requests.
Customers pay the charge of our technicians.
(1) Round-trip Airplane Ticket
(2) Charges of transportation, accommodation and communication
(3) The allowance for the technicians is USD 80 per day for one person.
(4) An interpreter is needed.
6. Spare parts:
Spare parts for one year are needed for the customers, and we suggest that customers should buy the spare parts. (Fittings list will be provided.)
7. English manual, Figuration drawing, and footing drawings are provided.
- Rotary Belt Curing Machine 1 Pieces / (Min. Order)
- 4 Roll Calender Machine 1 Pieces / (Min. Order)
- Two Roll Calender Machine 1 Pieces / (Min. Order)
- Rubber Sheet Product Calendering Line 5 Pieces / (Min. Order)
- 3 Roll Rubber Mixing Milling Machine 1 Pieces / (Min. Order)
- 2 Open Roll Mill Rubber 1 Pieces / (Min. Order)
- Two Roll Mill For Plastic And Rubber Mixing Compounding Machine 1 Pieces / (Min. Order)
- Single-stage Low-temperature Rubber Mixing System 1 Pieces / (Min. Order)
- PVC Plastics Floor Sheet Calendering Line 1 Pieces / (Min. Order)
- Rotary Belt Curing Machine 1 Pieces / (Min. Order)
- 4 Roll Calender Machine 1 Pieces / (Min. Order)
- Two Roll Calender Machine 1 Pieces / (Min. Order)
- Tire Fibre Film Add Tension Calendering Line 1 Pieces / (Min. Order)